Journal Information

Article Information


Organizational collaboration, hybrid structure, governance and value creation:

Evidence from Indian public-private partnerships


Abstract

This study was conducted to understand the various causalities and consequences of the hybrid structure and governance under public private partnerships (PPPs). Narrations pertaining to the central question of the research were collected from senior officials from PPPs in India, including executives from public agencies and private agencies. The grounded theory approach was used to analyze the narrations. Classical content analysis, selective coding and axial coding methods were used for data analysis.Complementary assets and capabilities among organizations, and inability to carry out project as a stand alone organization were the major casualties of the PPP structure. There were two dimensions of governance complexity, i.e. (i) Uninterpretable rules, policies, systems, and (ii) unexpected actions/decisions in uncertainty, in the PPP structure. The causalities in the complexity of the governance of the hybrid PPP structure were (i) organizational attributes, (ii) stakeholders’ expectations, (iii) power of control, (iv) institutional logic, (v) strategic decision making, and (vi) contract management. The attributes to the complex PPP governance system were, trust, ego, interpretation of complex operational phenomenon, mechanism to address risks and uncertainty and Interdependencies and reciprocity.


Introduction

Organization studies have been occupying a significant position the management discipline. Analysis of organizations became imperative with the advent of organizational collaborations, especially with the hybrid organizational structures. Scholars of organization studies have been more inquisitive in the recent past to understand how these hybrid organizations have designed and managed. Mair et al.1 noticed organizational hybridization and their governance structure are determined by the institutional logics. Organizational heterogeneity, presuming differences and institutional logics2 has made the organizational collaboration more complex, creating a complex structure and management of the hybrid organizations. Institutional logic, categorization, network effects has been occupied a significant space in organizational literature,still there exist blind spots in developing new understandings3. More specifically the focus on isomorphism and semblances in organization studies2 has left a space of understanding growing complexities in organization theories. Meyer and Hollerer4 have shown their concerns that over focusing on the formal organizations may leave a space to understand the alternative mode of organizing institutions.

The inter-organizational environments of the multi-stake holder hybrid organizations are yet to attract attention of organization scholars5. However the stability mechanism in the hybrid structure6 and partnership arrangement in multi-partner based organizational design with heterogeneous organization forms7 has been considered to a vacant space to fill with contemporary theory formation and empirical verification.There were two interesting dimensions of hybrid firms in which studies have been conducted, i.e. (i) governance of hybrid organizations with respect to transaction cost and embeddedness8, and (ii) design parameters for organizational alliance9. But there is significant research gap in establishing the linkage between organizational complexity and value creation with respect to hybrid structure and governance.

Partnership theories have occupied an important place in the general management and economics literature. Organizational partnership, collaboration, alliance, etc. has been used interchangeably10. One of the important factors of partnership in organizations was profit sharing11. Profit making organizations desire for higher economics of scale and high resource utilization, but the interdependencies among organizations some time lead to conflicts12. Sometimes organizational cultures and institutional distinctiveness also create hurdles in the partnership arrangements. Asthana et al.13 emphasized on trust which carries paramount importance in partnership arrangements.

The hybridization of public sector and private sector in delivering public services are increasing practiced. UNESCAP14 and FICCI15 defines public-Private Partnership (PPP) as an agreement or contract between government organizations (Public Parties) and private sector organizations (private Parties) for the provision of public services where the public party and a private party/parties share one or more responsibilities planning, execution, implementation and management control of a project (with their own experiences and strengths) in which the involved parties share resources, risks and responsibilities. The organization scholars are have studied the PPP structure and governance from the project perspectives from two major dimensions i.e. (i) sectoral basis [for example water sector16,17, sports tourism18, transport system and infrastructure19,20, Railways21, Textile22, health23, education24 etc.], and (ii) objective basis [for example risk management25,17, government obligations26, collaborative mechanisms & organizational studies27,28,19,29, corruption, security and law30, social entrepreneurship31, environment protection32, infrastructure development33, international policy and public policy networks34]. However there is a significant research gap in understanding in-depth into the structure and governance of PPPs.

A partnership between public sector and non-profit organization aim to have a common goal of societal value creation and social capital formation34. But the partnership arrangement gets into complex governance and structural design when the partners have two different orientation i.e. social orientations versus economic orientation.This article attempted to understand organizational collaboration, hybrid structure, governance and value creation with respect to Indian Public-Private-Partnership projects, especially by responding to the recent hue and cry on PPPs i.e. ‘what has gone wrong with PPPs in India’ in daily news magazines35,36,37,38,39,40,41,42. This study followed the Classical Grounded Theory Approach43,44. Following the approach of the theorists in the Grounded Theory, this study did not do a literature review (on PPPs) until data collection was finished. However, some literature on organizational collaboration were reviewed to gain an understanding on organizational collaboration, alliance, etc. The literature review was conducted later to analyze and compare the study results with previous studies. The manuscript has been divided into eight sections. The introduction section familiarizes the subject addressed in this study. The literature section makes a deep probing into the existing studies, especially on the structure and governance of hybrid organizations, to identify few research questions. The method section explains the sampling & data collection, and analytical procedure. The finding section identifies key findings, and develops a structural framework by linking various key variables. The discussion section discusses the study outcomes, and compares the outcomes with previous studies. The study results were consolidated in the conclusion section. The limitations of this study and the future research opportunities (especially the causality-outcome relationships) were discussed in the limitations and future research section. Finally, the contributions of this study to the practitioners and policy makers have been discussed in the practical implication section.

Literature

The significant causalities of coalitions, alliances and partnerships in organizations are symbiotic interdependencies, mutual reciprocity and complementary goals45. Organizational partnerships were subjected to circumstances pertaining to the purposes of organizations, their relationships and the stage of partnership development46. Hidden agendas, improper communications and lack of coordination led to failures in organizational alliances. Lavie et al.47 identified a typology of differences between alliance partners, i.e. (1) strategic differences and organizational differences, and (ii) cultural differences, and operational differences in routines. The dimensions of organizational differences in cultural space weremanagement style and organizational responsiveness.

Substantial work on hybrid organizational arrangements with respect to strategic alliances was done by Borys and Jemison6. They discussed hybrid organizations with respect to purpose, boundaries, value creation and stability. Hybrid organizations suffered from precision in the specification of boundaries and lack of cooperation from partner organizations. Hybrid organizations were not only be influenced by asset complementarities but also influenced by organizational levers like organizational structure and governance, human resource processes and the system of performance management48.

The structure of Hybrid organizations contained different levels of interdependencies leading to specific organizational coordination mechanisms and it's governance structure49. This different level of interdependencies or mutual dependencies was associated with transaction cost among the collaborating organizations7. Organizational structure of hybrid organizations was associated with the level of strategic complexities. The complexity in the integration of organizational partners was positively associated with the complexity in the governance structure of the hybrid organization50. The governance mechanism was highly dependent upon the production cost and the transaction cost of the collaborating organization51. There was a strong link between institutional logic and hybrid organizational forms52. Organizations entering into collaborations had either complementary organizational logics or competing organizational logics (organizational logics was varied from commercial to social intention). The sustainable hybrids couple elements pulling from different logics. Organizations can be categorized in two groups with respect to their orientations i.e. (i) hybrid organizations and, (ii) Market organizations53. Hybrid organizations were more about task organizations who were designed to perform specific tasks and being controlled for the quality and quantity of their products/services. Value creation in organizational partnerships and collaborations was related to the reciprocity and organizational philosophies. Value creation in hybrid forms was strongly influenced by the management and coordination mechanisms followed in the organization. Hybrid organizations experienced difficulties in value creation relative to the unitary organizations6. In a recent study, Hockerts54 cited that the hybrid organizations identified hidden complementarities and madea unique combination of resources, which often generated an innovative cognitive framework which was previously being ignored by market incumbents. One of the significant issues in the hybrid organization was decision making and human resource management, especially with respect to strategic decision making and power sharing55.

One of the interesting pieces of literature was contributed by56 where the researcher emphasized on the understanding of collaborative governance mechanism (for example institutional conditions, hold up issues and spillover issues) contextual to country specificity, economic systems, and social capital. The ability of the institutional adaptation was a major element of the success of collaborative governance57. Trust, commitment and share understanding were noticed as success elements in PPP based governance58.

A long list of studies on PPP identified in the body of literature (Table 1).PPP studies concentrated across various dimensions, for example, success factors59,60,61, risks and uncertainty62,63,64, transparency and accountability65,66,67,64, value creation and PPP performance68,69,66,70,71, contract management72,73, governance74,75.

Table?1

Significant studies in Public Private Partnerships

ResearchersYearDimensions/Outcome
Osei-Kyei and Chan2015The study focused on Critical Success Factors (CSFs) with respect to internal organizational elements (allocation and sharing of risk, and transparency in procurements) and external organizational elements (strong consortium of private organizations, political and public support).
Chung and Hensher2015Risk associations with PPPs, especially with respect to personal traits, contextual and contractual factors
Reynaers and Grimmelikhuijsen2015Input processes and output transparency in institutional, cognitive and strategic perspectives in the institutional environment.
Valero2015PPP outcomes subjected to opportunism behavior of public party in long term contractual agreement.
Greco2015Discussed on agency issues, incomplete contracts and imperfect bundling.
Babones and Gherman2014PPP implications in regional development
Demirag and Khadaroo2011Studied the relationship between accountability and value for money and identified four types of accountability cultures, processes and mechanisms that influence value for money decision in PPPs.
Forrer et al.2010Studied accountability in PPPs with respect to risk, costs and benefits, political and social impacts, expertise, collaboration, and performance measurement.
Koppenjan and Enserink2009Sustainability factors in PPPs with respect to regulatory rent seeking, and integration of economic and sustainability regulation; sustainability contract designing; risk perceptions of private parties and political uncertainties.
Wang2009Discussed the darker side of PPP, especially with respect to performance outcome and value for money.
Ysa2007The study focused on partnership arrangement and governance i.e. hierarchical governance in symbolic partnerships, market rules in instrumental partnerships, network-based governance in organic partnerships.
Hodge and Greve2007Performance outcome of private finance initiative based PPPs with respect to resource shifting from public to private and achievement of value for money. Also noticed high degree of complexity and governance in PPPs.
Chong et al.2006Performance of PPPs with respect to High transaction cost leads to inefficiency of PPPs leading to an increase in the pricing of products.
Bloomfield2006Discussed on risks, resource constraints and transparency barriers in PPPs
Trafford and Proctor2006The success factor in PPPs are good communication, openness, effective planning, ethos and direction.
Adams et al.2006Risks in PPP associated with corruption, asset ownership uncertainty and regulatory changes.
Awortwi2004PPPs follow principal-agent model and face the issues with contract management. Focused on contract management process and competition; efficiency, responsibilities and risks to private agents; good governance; and regulations.
Jamali2004Trust, openness and fairness are Critical Success Factors (CSFs) in PPPs which experience complexities with strategic and operational realities.

Past studies emphasized on good governance and governance strategy was critical in PPP success27,76. Organizations in PPPs had complementary and supplementary capabilities77, so the structure and governance in the PPPs adapted to complementary contribution of the stakeholder organizations78. There were two important elements noticed in the PPP organizational structure i.e. (i)Trust79,80 and (ii) risk25,81. Meidute and Paliulis82 observed dispute settlement methods and clarity in contract including undertakings and liability, evaluation of risks and payment mechanisms as success elements in PPPs. Grimsey and Lewis83 found various forms of risks those influence the project and private sector like financial risks, environmental risks, technical risks, operational risks, political risks etc.Another important aspect of PPP governance system was the balance between social orientation and economic orientation. Hauxman10 explained the resource dependency in partnership arrangement in the line of collaboration than competition under the synergy approach,but over emphasis of social orientation by public sector or over emphasizing on commercial orientation of private sector led to competition for goals which further created conflicting situations.

Methods

This study employed qualitative methods for data collection and data analysis. In the beginning the research problem was decided followed by framing open-ended research questions. Subsequently theoretical sampling and data collection has been made. The aim of this study was to generate theory from empirical data. For the same grounded theory was followed to build up and integrate set of ideas explains some behaviors43,44,84. In the past, the grounded theory approach had been confirmed as a suitable qualitative method to conduct management research85, and organization studies86,87. Data coding, analysis and theory development was made following43,44,84,88,89.

Sample and Data Collection

The goal of this exploratory study was to understand (i) what are the causalities and consequences of hybrid PPP organization, and (ii) what are factors associated with this hybrid structure and governance. To comprehend the same, the list of PPPs in India were identified from secondary sources, and ten PPPs were purposively chosen subjected to (i) accessibility and reachability of the researcher, and (ii) subjected to time and resource limitations associated with this research. Then from the chosen PPPs, two to three senior members were randomly selected (both from public sector and private sectors from the steering committee and the PPP projects) for a personal discussion. Out of the ten PPPs (initially selected) senior executives of two PPPs were not willing to participate in the discussions. All together twenty-eight senior officials were finally approached for discussion but only seventeen officials including six officials from public sector and eleven officials from private sectors were finally agreed for the personal discussion. The purpose of this study was not to verify the research question objectively but to understand the multidimensional view pertaining to the structure, governance and value creation in PPP subjectively. This study broadly followed the narrative methods of data collection of Koerner90. The motive behind gathering information in form of narrations is to cover social relationships, sequence of events and contextual signals. So the respondents were asked to narrate their experience and observation on the PPP from the initiation to operations to present situation [the respondents were asked to narrate their experience and observation pertaining to (i) how PPP hybrid organization was established and became operational, and (ii) what were the pros and cons with this hybrid structure and governance that the respondents have experienced with].

Analytical procedure

Data analysis was done following the approach of Stewart and Shamdasani91, and constant comparison method in grounded theory and theoretical sampling model of Charmaz92 and Bitsch88. The study used classical content analysis and keyword in context for contextualization for a thematic development. First an iterative process of reading, analyzing and rereading the text of all narrations was persued followed by semantical content analysis (i.e. the frequency at which certain concepts, phrases, adverbs are mentioned, the frequency at which certain object is classified). Coding method was exercised to do the open coding [ data analysis through line —by-line, sentence- by —sentence, paragraph- by —paragraph, document—by document analysis to generate conceptual and theoretical ideas]93 followed by selective coding, and axial coding (causal condition-central phenomenon-context-intervening condition-action/interaction-consequences]. The concepts, their properties and dimensions were identified. The constant comparison method was engaged following Bitsch88 i.e., the narrations were compared for similarities and differences to discover variations and patterns.

Findings

Private organizations were found different from public organizations with respect to their intents, interests, constraints, attributes and orientations. The major intent of public organizations was to accomplish social responsibilities while that of the private organizations were to achieve commercial or financial targets. Similarly the attributes of public organizations (power, standard rules and procedures) were found different from that of the private organizations (efficiency, improved MIS, quick decision making, matrix structure). The distinct intents, interests, constraints, attributes and orientations have given rise to the unique resources and capabilities to the public and private organizations [the assets and capability of organizations in the PPP were derived from the combinations and interactions among characteristics like organizational intent, interest, constraint, attribute and orientation]. The collaboration between public and private organizations helps them to achieve their interests and weaken the negative effects of the constraints (see Table 2).

Table?2

Difference between public organizations and private organizations

CharacteristicsPublic OrganizationsPrivate Organizations
Intent [what I want to achieve]Social performance (get the work done)Financial performance
Interest [what I normally do]Bureaucratic commitment to government and politicsCompeting among contractors for business and economics of scale
Constraints [difficulties for me]Specific assets and capabilitiesDependents upon government for projects/business
Attributes [what I have]Power, standard rules and proceduresEfficiency, improved MIS, quick decision making, matrix-structure
Orientations [how do I behave]Planning, Controlling, legal complianceAction

The organization and arrangement of the structure and governance of the hybrid PPP was the central phenomenon in this study. The dimensions, attributes and immediate outcomes of the structure and governance of the hybrid PPP were identified. The major causalitiesfor the organization of the PPP hybrid were (i) incapabilityof production and provision of services as standalone organization, and (ii) possession of complementary assets and capabilities among organization. There were two major dimensions of complexity associated in the PPP hybrid structure i.e. (i) uninterpretable rules and policies of the PPP organizational contract and functional modalities, and (ii) unexpected actions/decisions in case of uncertain events.

The complex hybrid PPP structure and governance is attributed by five elements (i) trust, (ii) ego, (iii) interpretation of complex operational phenomenon, (iv) mechanism to address risks and uncertainty, and (v) interdependencies and reciprocity. Trust played an important role the organization of the governance structure. This study identified six types of trust in the PPPs i.e. (i) entry level trust, (ii) operational level trust, (iii) cognitive trust, (iv) affective trust,(v) organizational trust, (iv) interpersonal trust (Table 3). The operational level trust was higher than the entry level trust ]. The trust among the partners built up over time but was not significant since the trust was only cognitive in nature [i.e. organizations expected that their partners would behave in a certain way since they are governed by contract agreements]. From ex-ante to ex-post project situation the cognitive trust could not be converted to affective trust. Hence trust was limited to organizational trust [i.e. individual's trust on their partner organizations] than interpersonal trust [individual's trust on the employee/representatives of their partner organizations].

Table?3

Types of Trusts in PPPs

TrustsDefinitions
Entry Level TrustThe level of trust among partner organizations (i.e. among the workers of partner organizations) during initiation of the PPP (in the ex-ante project situation).
Operational Level TrustThe level of trust among partner organizations (i.e. among the workers of partner organizations) when PPPs are in operational level (in the ex-post project situation).
Cognitive TrustOrganizations expected that their partners would behave in a certain way [i.e. expectation of conformity].
Affective TrustTrust among partner organizations governed by feeling and emotion by working together for a period of time.
Organizational TrustThe level of trust that an individual has on his/her partner organizations [i.e. trust between individual and his/her partner organizations].
Interpersonal TrustThe level of trust that an individual has on the employees of his/her partner organizations [i.e. trust between two individuals from two different organizations].

The second attribute of the PPP structure and governance was ego [of the representatives of the partnering organizations]. One type of the ego was position ego [ego of an individual because of an important position he/she occupies in their respective organizations or the PPP structure], and the other type of the ego was representation ego [ego of an individual because he represents an important organizations (representatives of each organizations believed that the role of their organization is very important as compared to other organizations in the PPP)].

The third attribute was ability of interpretation of complex operational phenomenon. When organizations got into partnerships, in the operational process they come across complex phenomenon which all partner organizations were unable to understand with same level. Inability in understanding created unrest among partner organizations. The fourth attribute was the absence of a mechanism to address risks and uncertainty. Partners in the PPP understand the risks and uncertainties in their own dimensions [for example public sector was concerned in the political angle while private sector was concerned in the commercial angle]. The fifth attribute was the degree of interdependencies and reciprocity among organizations. So every action an organization takes has got a twin impact i.e. an impact on it's own organization, and an equal or different impact on the partner organization.

This high level of complexity with their attributions led to five types of outcomes i.e. (i) delay operations: the organizational operations are delayed; (ii) blame game: organizations (workers) tend to not to bear the responsibility and accountability of their mistakes, and often blame partner organizations; (iii) high fear factor: people in the PPP structure do have a high degree of fear with in them expecting anything can go wrong and there is a chance of mistake being committed by them as they do not able to interpret the rules/policies properly; (iv) lack of initiatives: no one want to take an initiative because as the initiator may be caught and punished if anything do not match with the policy framework which are difficult to interpret fully; and (v) rule bound: organizations (people) become very much rule bound as deviations are questionable and punishable.

The organization of the structure and governance of the hybrid PPP was very much contextual and subjected to certain intervening conditions. There were six intervening conditions for the central phenomena described under this study. First, the organizational attributes of the partner organizations (system, structure, governance and policies of the partner organizations). Second, the expectations of the stakeholders of the partner organizations (the major stake holder of the public organization was the public, and the major stake holder of the private parties were the shareholders and other partnering private organizations in the consortium). Third, the power of control (public party had the higher power of control as per the PPP regulation). Fourth, the institutional logic (the institutional logic of public party was to provide public services whereas the institutional logic of private party was the commercials). Fifth, strategic decision making (how much is the role of private party and public party in the strategic decision making). Sixth, the contract management team (ability to manage contract and relationships). However this complex structure and governance of the hybrid PPP along withit's intervening condition was contextual to (i) Indian PPP models, (ii) Indian political and legal environment, and Indian Business Environment (differences in the characteristics of public and private organizations: intents, interests, constraints, attributes and orientations).

The hybrid PPPs with their structure and governance had taken a set of actions/strategies which further ended up to a valuable consequence to all partners and stakeholders. Despite of differences, organizations still prefer to stay together in the partnership because of their latent intentions. Partnership malfunction is a cost for the private party; while partnership failure is a responsibility for public party [government is answerable to public for any deviation or failure of the hybridity]. This study noticed three possible reasons for success of the hybridity in PPP i.e. (i) stick to deliverables, (ii) compromise with organizational intents, and (iii) strengthening trust bond from entry level to operational level. Staying together definitely lead to value creation to all parties i.e. value creation to public party by fulfilling it's responsibility in creating and establishing a service delivery system; value creation for private party by(i) achieving commercial benefits, and (ii) enhancing scale economics and specialization; and. value creation for public by availing public services.

Causality?and?Consequences?Map?of?Structure?&?Governance?in?PPPs

https://emergence.blob.core.windows.net/article-images/2015/12/f6855e9a-2312-ebcb-2836-bdf840f3f702.png

Discussion

The hybrid organizations can be divided into four categories with respect to organizational partnerships i.e. private —private partnership, public-public partnership, public-social partnership, and public-private partnership. The organizational intents of all these organizational are different, for example the intent for public organizations and social organization are public service delivery, while the organizational intent of private organizations are commercials and profit structures. Hence the public —private partnerships are the most complex organizational structure and governance (as compared to other organizational partnerships) because of the contrasting and conflicting organizational intents.

There were two different types of causality analysis was done in this study. First, analysis on the causality of the hybrid structure, and second, analysis on the causality of the complexity of the hybrid structure. The causality of hybrid PPP was assets/resources complementarities and interdependence i.e. inability as a standalone player to carry outcertain tasks or achieve certain organizational goals [as seen in previous study, i.e., 94]. Harrison et al.95 noticed potential of a greater value creating synergy which comes from alliances with resource complementarities.

The complexity of the hybrid structure was resulted from intervening conditions [organizational attributes, institutional logics, power roles, strategic decision making capabilities, and contract management (ability to manage contract and relationships) (see figure 1)]. An earlier study noticed existence of contract hazards and mutual interdependencies among partner organizations in the hybrid organizational structure and governance7. This study found similar attributes, and the PPP structure and governance was influenced by the intervening conditions. So a contract hazard in PPPs can be an outcome of the intervening conditions.

Complexity to the PPP hybrid was attributedby complex operational phenomenon, and risks and uncertainty (Follow Figure 1). Past studies emphasized on risk as a predictor of PPP success or failure72,64. Also previous studies have identified sharing of risk, and transparency in procurements asthe critical success factors in PPPs59 where risk associations with PPPs were governed by contextual and contractual factors62. However, this study did not find risk as a factor of success or failure of PPP, but risk was found as an embedded element in PPP which resultedfrom the complex interaction betweenintervening conditions and PPP attributes. Earlier studies found ‘contractual agreement’ as a factor influence to the PPP governance74,68,72,73, but this study noticed contract management as an intervening condition to the complex PPP structure and governance.

Power of control was observed to be an intervening condition condition to organizational complexity in the structure in governance in the hybrid set up, and similar phenomenon was noticed by Bjerregaard and Jonasson96 [they found power asymmetry as an intervening condition in the structure in governance in the hybrid organizations] , The governance structure gets more complex if the strategic complexity in integration of project partners is very complex50 but this study found that the governance structure becomes complex because of the degree of strategic decision making and the power of control rests in the organizations in the PPPs.

Institutional logics was found causing complexity in the governance of the PPP. The institutional intent of private sector was different from that of the public sector [even though the parties have joined hands because of their complementary assets and capabilities]. Private sectors had a different organizational attributes (system, structure, rules, styles and policies) as compared to that of the public sector in the context of Indian political, legal and business environment. The fusion of organizational attributes was difficult in the hybrid governancewhich has made the PPP structure and governance more complex. Under the Indian situation the public sector was able to exercise high degree of power of control and strategic decision making as compared to those of the private sector. But at the same time the contract management was being controlled by the private sector who practicallyimplement the PPP project either by putting it's resource or by pooling resources from others. Sstake holders’ expectations were also different from both the parties (public party and private party) in the PPP. All these factors have brought complexity in the governance of the hybrid PPP. Some of these findings corroborate with previous studies, for example, Lindqvist97 observed conflicting legislation and power relations influence the governance of PPPs; and Brinkerhoff34 found the diversity among the stakeholders in the PPP which accounted for the intensity of conflicts. Similarly Dormois et al.98 emphasized on organizational logic and attributes as instruments to differentiate private sector from public sector and found path dependency as causality in the differential nature of public sector and private sector. In the presence of asymmetric information in the interdependence mode leads to conflicts in the partnership governance.

Previous studies explained that the public organization and private organization collaborate and cooperate through a contract based partnership mechanisms to achieve a common goal by sharing their resources and risks99,100,101,102. Similarly Keene77 found organizations who have complementary and supplementary resources and capabilities with a common interest get into a PPP mode of partnership. However this study noticed that the public organization and private organization collaborate through a partnership arrangement and share resources and capabilities to perform a common task but the ultimate goals of the partners were different even though task-based goals remains the same. So, this study claims that the PPP mode of partnership exist to attain meaningful goals than common goals.

The PPP success [value creation] was ensured by appropriate actions/strategies as shown in figure 1 [Stick to deliverables, compromise with organizational intents, strengthening trust bond from entry level to operational level]. The interpersonal trust is governed by cognitive and affective trusts which influences interpersonal cooperation in organizations103. Chia-Hui79 noticed shared values and trust as major organizing principles of dynamic collaborative mechanisms in organizational partnerships, and Edelenbos80 commented trust is one of the critical factor in the sustainability of PPP. Jamali61 noticed that trust, openness and fairness are Critical Success Factors (CSFs) in PPPs which experience complexities with strategic and operational realities. Similarly, Tan and Lim104 explained trust in the line of openness, cooperation, commitment, inter-dependence, reliability and competence among members. Ansell and Gash58 argued that the trust and shared understanding were success elements in PPP governance. Trafford and Proctor60 identified good communication, openness, effective planning, ethos and direction as success factors in PPPs. This study also argue that trust is an important attribute but the study found trust exist in different forms, i. e , entry level trust, operational level trust, cognitive trust, affective trust organizational trust, interpersonal trust. But the successful element for PPP governance is to raise the operational level trust at a higher level as compared the entry level trust. However, the study did not find the contractual trust (trust of character like honesty, consistency and fairness), competency trust (organization's ability to complete the task strictly adhering to the laid contractual conditionality), and communication trust (disclosing accurate information to partners) among PPP partners.The complex interaction between these two attributes i.e. trust and ego [higher ego, weak trust] led to weak communication among the partner organization.Studies on organizational alliances found that partners who acknowledge latent differences can overcome the negative consequences of the partnerships outcomes47. Similar outcomes have been traced out in the PPPs i.e. when partners compromise with organizational intents they are like to derive value (by achieving their specific interests) out of the partnership arrangements.

Past academic studies have not much focused on the success strategies in organizational collaboration. Few studies emphasized on cooperation and coordination as key to partnership success105. This study could not find any concrete strategy per se for inter-organizational collaborations in PPPs, but a possible set of actions (adhering to deliverables, compromising with organizational intents, and strengthening trust bond from entry level to operational level) were noticed for partnership success. Also it was seen that the set of actions to make the collaboration success was not a strategy but a fear factor of partnership failure. A partnership malfunction invites troubles for public sector in fulfilling government's commitment to public and politics. At the same time any malfunctions has a financial implication to the private party.

Conclusion

This qualitative study was conducted employing grounded theory approach to probe deep into the structure and governance of PPPs in the context of Indian legal, political and business environment. The major causality of the PPP hybrid structure was the complementary and supplementary relationship among project partners, and the inability of any partner to do the task standalone. The major causality in the complexity of the governance of the hybrid PPP structure were (i) organizational attributes (policies, styles, systems, structures) of each partnering organizations, (ii) stakeholders’ expectations from each partnering organizations, (iii) power of control held with each partnering organization, (iv) organizational logic of each partnering organizations, (v) strategic decision making power held with each partnering organization, and (vi) the efficiency of contract management team. The complexity in the PPP governance had two different dimension i.e. one uninterpretable rules, policies, systems, and two, unexpected actions/decisions in uncertainty. The major attributes to this governance system were trust, ego, interpretation of complex operational phenomenon, mechanism to address risks and uncertainty and Interdependencies and reciprocity. The complexity in the governance structure in the PPP leads to series of phenomenon like delay operations, blame games, high fear factors, lack of initiatives and highly rule bound behavior. To create value with complex governance structure, PPPs have taken a set of actions [stick to deliverables, compromise with organizational intents, and strengthening trust bond from entry level to operational level] to create value. Even though the major stakeholders in the PPP (public sector and private sector) have common interest but they have a different goals. For example, the goal of public sector was creation of service delivery systems for public while the goal of private sector was commercial benefits, achieving scale economics and specializations.

Limitations and Future Research

Even though this study was conducted following the theoretical framework of Koerner90 but still it suffered from lesser sample size. The conformity of the relationships [causal condition-central phenomenon-context-intervening condition-action/interaction-consequences] would have been higher had there been more number of samples. I request researcher to conduct similar studies in a higher sample size. This study identified the causality of PPP governance and the consequences of it along with intervening conditions (seemingly external variables) and attributes (seeming internal variables). I invite researchers to verify quantitatively if these intervening conditions and attributes have any mediating and moderating impact in the relationship between causality and consequences in PPP governance and structure. The causality-consequence relationship in this study identifies a series of propositions [for example: sticking to deliverable leads to value creation, relationship between trust and delay in operations etc.] which can be tested specifically using qualitative methods and quantitative methods. Future researchers should study the relationship between immediate outcome (delay operations, blame games, high fear factors, lack of initiatives and highly rule bound behavior) and attributes (trust, ego, interpretation of complex operational phenomenon, mechanism to address risks and uncertainty and Interdependencies and reciprocity) in the PPP.

Practical Implications

Policy makers and PPP practitioners should use the causality-consequence framework to handle the complexity in the PPP governance. There were two types of factors which lead to the complexity in the PPP governance i.e. (i) factors difficult to control: organizational attributes, expectation of stakeholders, and institutional logic; and (ii) factors can be controlled: power of control, strategic decision making and contract management. Policy makers and practitioners should emphasize on the factors which can be controlled to address the complexity and bring simplicity in the governance. Contract hazards are important issues which need to be emphasized by Indian PPPs. Also the importance of contract management team needs to be recognized in the building of relationships and trusts among project parties. PPP practitioners should work on the strategies/set of actions which lead to value creation [stick to deliverables, compromise with organizational intents, and strengthening trust bond from entry level to operational level] through the PPP mode.

References

ref1?

Mair, J., Mayer, J. and Lutz, E. (2015).Navigating Institutional Plurality: Organizational Governance in HybridOrganizations.Organization Studies, 36(6): 713-739.

ref2?

Greenwood, R., Hinings, C. R. and Whetten, D. (2014), Rethinking Institutions and Organizations. Journal of Management Studies, 51: 1206—1220.

ref3?

Lounsbury, M. and Beckman, C. M. (2015), Celebrating Organization Theory. Journal of Management Studies, 52: 288—308.

ref4?

Meyer, R. E. and Höllerer, M. A. (2014), Does Institutional Theory Need Redirecting?. Journal of Management Studies, 51: 1221—1233.

ref5?

Arellano-Gault, D., Demortain, D., Rouillard, C. and Thoenig, J. (2013). Bringing public organizations and organizing back in. Organization Studies, 34(2): 145-167.

ref6?

Borys, B. and Jemison, D.B. (1989).Hybrid Arrangements as Strategic Alliances: Theoretical Issues in Organizational Combinations. Academy of Management Review, 14(2): 234-249.

ref7?

Menard, C. (2004). The economics of hybrid organizations. Journal of Institutional and Theoretical Economics, 60: 345-376.

ref8?

Ebers, M. and Oerlemans, L. (2013).The variety of governance structure beyond market hierarchy. Journal of Management, doi: 10.1177/0149206313506938

ref9?

Albers, S., Wohlgezogen, F. and Zajac, E.J. (2013). Strategic alliance structure: an organizational design perspective. Journal of Management, doi: 10.1177/0149206313488209.

ref10?

Huxham, C. (1996). Collaboration and Collaborative Advantage'in C. Huxham (ed) Creating Collaborative Advantage : 1-18. Sage, London.

ref11?

Alchian, A. and Demsetz, H. (1972).Production, Information Costs, and EconomicOrganization.American Economic Review, 62(5):777-795.

ref12?

Zartman, I. W. (1981). ‘Explaining Disengagement', in J. Z. Rubin (ed.), Dynamics of Third-Party Intervention.New York: Praeger, 148—67.

ref13?

Asthana, S., Richardson, S. and Halliday, J. (2002). Partnership working in public policyprovision: a framework for evaluation.Social and Policy Administration, 36 (7) : 780-795.

ref14?

UNESCAP (2011).A Guidebook on Public-Private Partnership in Infrastructure, Economic and Social Commission for Asia and Pacific, United Nations, UNESCAP Bangkok.

ref15?

FICCI (2012). Accelerating Public Private Partnership in India, FICCI, New Delhi.

ref16?

Lee, S. (2010). Development of public private partnership in Chinese water sector. Water Resource Management, 24(9): 1925-1949.

ref17?

Ameyaw,E.E. and Chan,A.P.C (2013). Identifying public-private partnership (PPP) risks in managing water supply projects in Ghana.Journal of Facility Management, 11(2): 152-182.

ref18?

Skoric, S. and Bartoluci, M. (2012). Public-private partnership in development of winter sports tourism. Tourism and Hospitality Management, 168-176.

ref19?

Estache, A., Guasch, J., Iimi, A. and Trujillo, L. (2009).Multidimensionality and Renegotiation: Evidence from Transport-Sector Public-Private-Partnership Transactions in Latin America, Review of Industrial Organizations, 35(1-2): 41-71.

ref20?

Mustafa, A. (1999). Public-private partnership: An alternative institutional model for implementing the private finance initiative in the provision of transport infrastructure. Journal of Project Finance, 5(1): 56-71.

ref21?

Sharma, A.K. (2009). Modernization of Railway Stations in India: A Case for Public-Private Partnership with Special Reference to New Delhi Railway Station. South Asian Journal of Management, 16(1): 102-116.

ref22?

Bruce, R.R. (2013). Sri Lanka textile industry's public private partnership project: a case study. The International Journal of Public Sector Management, 26(2): 153-162.

ref23?

Etheredge, L. (1993). The public private health partnership.Health Care Strategic Management, 11(3): 12-14.

ref24?

Rhoden-Trader,J. (2000). Public private partnership and education in America.Spectrum, 73(1): 25-26.

ref25?

Nisar, T.M. (2007). Risk management in public private partnership contract. Public Organization Review, 7(1): 1-19.

ref26?

Verma, S. (2010).Government obligations in public private partnership contracts. Journal of Public Procurements, 10(4): 564-598.

ref27?

Ismail, S. (2013). Critical success factors in public private partnership (PPP) implementation in Malaysia. Asia Pacific Journal of Business Administration, 5(1): 6-19.

ref28?

Cheung, E., Albert, P.C.C. and Kajewski, S. (2012). Factors contributing to successful public private partnership projects.Journal of Facilities Management, 10(1): 45-58.

ref29?

Regeczi, D. (2005). Limited partnership: the lack of sustainable development in relation to participation in Hungarian public-private partnerships. Business Strategy and the Environment, 14(4): 205-215.

ref30?

Hardouin, P. (2009). Banks governance and public-private partnership in preventing and confronting organized crime, corruption and terrorism financing. Journal of Financial Crimes, 16(3): 199-209.

ref31?

Naem, M. (2014). Social Entrepreneurship: An effective mode of promoting Public Private Partnership in Middle East. Asia Pacific Journal of Management & Entrepreneurship Research, 3(2): 5-28.

ref32?

Kuronen, M., Junnila, S., Majamaa, W. and Niiranen, I. (2010).Public-private-people partnership as a way to reduce carbon dioxide emissions from residential development.International Journal of Strategic Property Management, 14(3):200-216.

ref33?

Essia, U. and Yusuf, A. (2013).Public-Private-Partnership and Sustainable Development of Infrastructures in Nigeria. Advances in Management and Applied Economics, 3(6): 113-127.

ref34?

Brinkerhoff, J.M. (2002).Global public policy, partnership, and the case of the world commission on dams. Public Administration Review, 62(3): 324-336.

ref35?

The Economics Times (2015). PPPs are good in theory, but in India they are a failure in practice. The Economics Times, New Delhi, 5th July 2015.

ref36?

The Financial Express (2015). Editorial: Getting PPP right. The Financial Express, 1st June 2015.

ref37?

Hindustan Times (2015). Metro a non-starter: UT sticks to no-PPP stand on ‘unviable’ project. Hindustan Times, Chandigarh, 4th April 2015.

ref38?

India Today (2014). PPP model in Railways will need more government commitment to succeed. India Today, Mumbai, 8th July 2014.

ref39?

Business Standard (2013). What is wrong with PPPs in India. Business Standard, New Delhi, 6th July 2013.

ref40?

The Hindu Business Line (2013). Most States unprepared for PPPs. Business Line, 17th Jan 2013.

ref41?

The Hindu Business Line (2012). PPPs for roads, a costly affair. The Hindu Business Line, 27th June 2012.

ref42?

The Economist (2012). India's love affair with public-private partnerships faces a stern test.The Economist, Chennai, 15th Dec 2012.

ref43?

Glaser, B.G. and Strauss, A.L. (1967). The discovery of Grounded Theory. New York: Aldine Publishing Co.

ref44?

Glaser, B.G. (1978). Advances in the methodology of grounded theory. Mill Valley: Sociology Press.

ref45?

Fenger, M. and Kok, P.J. (2001). Interdependency, beliefs and coalition behavior:a contribution to the advocacy coalition framework.Policy Sciences, 34 (2):157-170.

ref46?

McQuaid, R.W. (2000). The theory of partnerships - why have partnerships? in Osborne, S.P. (ed.)Managing public-private partnerships for public services: an international perspective, London: Routledge.

ref47?

Lavie, D., Haunschild, P.R. and Khanna, P. (2012). Organizational differences, relational mechanisms, and alliance performances. Strategic Management Journal, 33: 1453-1479.

ref48?

Haigh, N., Walker, J., Bacq, S. and Kickul, J. (2015). Hybrid Organizations: Origins, Strategies, Impacts and Implications. California Management Review, 57(3): 5-12.

ref49?

Aggarwal, V.A., Siggelkow, N. and Singh, H. (2010).Governing collaborative activity: interdependence and the impact of coordination and exploration. Strategic Management Journal, 32(7): 705-730.

ref50?

Garcia-canal, E. (1996). Contractual Form in Domestic and International Strategic Alliances. Organization studies, 17(5): 773-794.

ref51?

Bello, D.C., Dant, S.P. and Lohtia, R. (1997). Hybrid governance: the role of transaction costs, production costs and strategic considerations. The Journal of Business & Industrial Marketing, 12(2): 118-138.

ref52?

Pache, A. and Santos, F. (2013). Inside the hybrid organizations: selective coupling as a response to competing institutional logics. Academy Management Journal, 56(4): 972-1001.

ref53?

Joldersma, C. and Winter, V. (2002). Strategic management in hybrid organizations.Public Management Review, 4(1): 83-99.

ref54?

Hockerts, K. (2015). How hybrid organizations turn antagonistic assets into complementarities. California Management Review, 57(3): 83-106.

ref55?

Lentz, S.S. (1996). Hybrid Organization Structures: A path to cost saving and customer responsiveness. Human Resource Management, 35(4): 453-469.

ref56?

Nooteboom, B. (2000). Learning by interaction: absorptive capacity, cognitive distance and governance. Journal of Management and Governance, 4(1-2): 69-92.

ref57?

Emerson, K. and Gerlak, A.K. (2014). Adaptation in collaboration governance regimes.Environmental Management, 54(4): 768-781.

ref58?

Ansell, C. and Gash, A. (2008).Collaborative governance in theory and practice.Journal of Public Administration Research and Theory, 18(4): 543-571.

ref59?

Osei-Kyei, R. and Chan, A.P.C. (2015). Review of studies on the Critical Success Factors for Public—PrivatePartnership(PPP) projects from 1990 to 2013. International Journal of Project Management, 33(6): 1335-1346.

ref60?

Trafford, S. and Proctor, T. (2006). Successful joint venture partnerships: public-private partnerships. The International Journal of Public Sector Management, 19(2): 117-129.

ref61?

Jamali, D. (2004). Success and failure mechanisms of public private partnerships (PPPs) in developing countries: Insights from the Lebanese context. The International Journal of Public Sector Management, 17(4/5): 414-430.

ref62?

Chung, D. and Hensher, D.A. (2015). Modelling Risk Perceptions of Stakeholders in Public-PrivatePartnership Toll Road Contracts. Abacus, 51(3): 437-483.

ref63?

Adams, J., Young, A. and Wu, Z. (2006). Public private partnerships in China: System, constraints and future prospects. The International Journal of Public Sector Management, 19(4): 384-396.

ref64?

Bloomfield, P. (2006). The Challenging Business of Long-Term Public-Private Partnerships: Reflections on Local Experience. Public Administration Review, 66(3): 400-411.

ref65?

Reynaers, A. and Grimmelikhuijsen, S. (2015). Transparency in public-privatepartnerships: not so bad after all? Public Administration, 93(3): 609-626.

ref66?

Demirag, I. and Khadaroo, K. (2011). Accountability and value for money: a theoretical framework for the relationship in public—private partnerships. Journal of Management & Governance, 15: 271-296.

ref67?

Forrer, J., Kee, J.E. Newcomer, K.E. and Boyer, E. (2010). Public-Private Partnerships and the Public Accountability Question. Public Administration Review, 70(3): 475-484.

ref68?

Greco, L. (2015). Imperfect Bundling in Public-Private Partnerships. Journal of Public Economic Theory, 17(1): 136-146.

ref69?

Babones, A. and Gherman, M. (2014). Public-privatepartnership in the context of regional development - a solution for renewable energy projects? Theoretical & Applied Economics, 21(10): 77-88.

ref70?

Hodge, G.A. and Greve, C. (2007). Public-Private Partnerships: An International Performance Review. Public Administration Review, 67(3): 545-558.

ref71?

Chong, E., Huet, F., Saussier, S. and Steiner, F. (2006). Public Private Partnerships and prices: evidence from water distribution in France. Review of Industrial Organization, 29(1/2): 149-169.

ref72?

Koppenjan, J.F.M. and Enserink, B. (2009). Public-Private Partnerships in Urban Infrastructures: Reconciling Private Sector Participation and Sustainability. Public Administration Review, 69(2): 284-296.

ref73?

Awortwi, N. (2004). Getting the fundamentals wrong: woes of public-private partnerships in solid waste collection in three Ghanaian cities. Public Administration & Development, 24(3): 213-224

ref74?

Valero, V. (2015). Government Opportunism in Public-Private Partnerships.Journal of Public Economic Theory, 17(1): 111-135.

ref75?

Ysa, T. (2007). Governance forms in urban Public-Private Partnerships. International Public Management Journal, 10(1): 35-57.

ref76?

Collin, S.Y. and Smith, E. (2008). Democracy and private property: governance of a third party public private partnership. Public Organization Review, 8: 53-68.

ref77?

Keene, W. O. (1998). Reengineering public-private partnerships through shared-interest ventures.The Financier, 5(2&3): 55-61.

ref78?

Kochan, T.A. and Rubinstein, S.A. (2000). Towards a stakeholder theory of firm: the Saturn partnership. Organization science, 11(4): 367-386.

ref79?

Chia-Hui, H. (2007).Identifying Stakeholders’ Positions through Value Creation System.The Business Review, Cambridge, 7(1): 254-261.

ref80?

Edelenbos, J., Klijn, E. H. and Steijn, B. (2007).The role of trust in public-private partnerships.Politik, 10 (3): 63-72

ref81?

Zou, P.X.W., Wang, S. and Fang, D. (2008). A life-cycle risk management framework for PPP infrastructure projects.Journal of Financial Management of Property and Construction, 13(2): 132-142.

ref82?

Meidute, I. and Paliulis, N. (2011).Feasibility study of public- private partnership. International Journal of Strategic Property Management, 15(3): 257-274.

ref83?

Grimsey, D. and Lewis, M.K. (2002).Evaluating the risks of public private partnerships for infrastructure projects.International Journal of Project Management, 20, 107.

ref84?

Strauss, A. L. (1987). Qualitative research for social scientists. Cambridge: Cambridge University Press.

ref85?

Locke, K. (2001).Grounded theory in management research. London: Sage

ref86?

Martin, P.Y. and Turner, B.A. (1986). Grounded Theory and Organizational Research. Journal of Applied Behavioural Science, 22(2): 141-157.

ref87?

Turner, B.A. (1983). The Use of Grounded Theory for the Qualitative Analysis of Organizational Behaviour. Journal of Management Studies, 20: 333—348.

ref88?

Bitsch, V. (2005). Qualitative Research: A Grounded Theory Example and Evaluation Criteria. Journal of Agribusiness, 23(1): 75-91.

ref89?

Cho, J.Y. and Lee, E. (2014). Reducing confusion about grounded theory and qualitative content analysis: similarities and differences. The Qualitative Report, 19 (64): 1-20.

ref90?

Koerner, M.M. (2014). Courage as identity work: accounts of workforce courage. Academy of Management Journal, 57(1): 63-93.

ref91?

Stewart, D.W. and Shamdasani, P.N. (2015). Focus Group: Theory & Practice, 3rd Ed. Los Angeles: Sage.

ref92?

Charmaz, K. (2000). Grounded theory: Objectivist and constructivist methods. In N. K. Denzin & Y. S. Lincoln (Eds.), Handbook of qualitative research(2nd ed., pp. 509—535). Thousand Oaks, CA: Sage.

ref93?

Walker, D. and Myrick, F. (2006). Grounded theory: an exploration of process and procedures. Qualitative Health Research, 16(4): 547-559.

ref94?

Sekhir, N., Feachem, R. and Ni, A. (2011). Public private integrated partnerships demonstrate the potential to improve health care access, quality, and efficiency. Health Affairs, 30(8): 1498-1507.

ref95?

Harrison, J.S., Hitt, M.A., Hoskisson, R.E. and Ireland, R.D. (2001).Resource complementarity in business combinations:Extending the logic to organizational alliances. Journal of Management, 27: 679-690.

ref96?

Bjerregaard, T., Jonasson, C. ( 2013). Organizational Responses to Contending Institutional Logics: The Moderating Effect of Group Dynamics. British Journal of Management, 25(4): 651-666.

ref97?

Lindqvist, K (2013). Hybrid Governance: The Case of Household Solid Waste Management in Sweden. Public Organization Review, 13: 143-154.

ref98?

Dormois, R., Pinson, G. and Reignier, H. (2005). Path-dependency in public-private partnership in French urban renewal.Journal of Housing and the Built Environment, 20(3): 243-256.

ref99?

Domberger, S. and Fernandez, P. (1999).Public-Private Partnerships for service delivery. Business Strategy Review, 10(4): 29-39.

ref100?

Domberger, S. and Jensen, P. (1997).Contracting out by the public sector: Theory, evidence and prospects. Oxford Review of Economic Policy, 4: 67-78.

ref101?

Entwistle, T. and Martin, S. (2005). From competition to collaboration in public service delivery: A new agenda for research. Public Administration, 83(1): 233-242.

ref102?

Chinyere, I.I. (2013). Comprehensive Objectives for PPP Projects: Case of Beijing Olympic Stadium. International Journal of Business and Management, 8(9): 88-110.

ref103?

McAllister, D.J. (1995). Affect- and cognition-based trust as foundations for interpersonal cooperation in organizations. Academy of Management Journal, 38(1): 24-59.

ref104?

Tan, H.H. and Lim, A.K.H. (2009). Trust in co-workers and trust in organizations. Journal of Psychology, 143(1): 45-66.

ref105?

Gulati, R. Wohlgezogen, F. and Zhelyazkov, P. (2012).. The Two Facets of Collaboration: Cooperation and Coordination in Strategic Alliances.Academy of Management Annals. 6 531—583.

ref106?

Eigen, Z.J. (2012). Empirical studies of contract. Faculty working paper, Northwestern University of Law, http://scholarlycommons.law.northwestern.edu/cgi/viewcontent.cgi?article=1203&context=facultyworkingpapers, acc-essed on 10/12/2014.

ref107?

Wang, Y. (2009). A Broken Fantasy of Public-Private Partnerships. Public Administration Review, 69(4): 779-782.


Article Information (continued)


This display is generated from NISO JATS XML with jats-html.xsl. The XSLT engine is Microsoft.